on 10-16-2009 1:21 PM
Dear Co Experts,
I am new to product costing, in product costing there are two way to estimate the cost of the product by using make to stock and make to order.
Kindly tell me the scenario of make to order and make to stock
In make to order scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
In make to stock scenario what are the minimum configuration steps are required in controlling, PP, MM, and SD.
How we will defend the costing variant in make to order scenario
I really appreciate for your early response
pls tell me end to end cycle for both the scenarios
Warm Regards
Venkataswamy
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All,
WIP is calculated when the Production Order status is DLV; this statement I have seen on the above Dublin point. Is it correct; i hope WIP is calculated when the Order is REL Status.
When ever the goods are delivered then, means the goods are in Customer hand, then how can we calcuate the WIP; is it correct; Correct me if i am wrong.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Some of the FI entries would be like
On Issue of materials
Consumption Dr
Inventory Cr
On Receipt
Inventory-FG/SFG Dr
Cost of goods mfd Cr
In case of WIP at period end
WIP Dr
Change in stock Cr
(This will get reversed on confirmation in following period)
For variances (at Settlement)
Cost of goods mfd Dr/Cr
Production variances Dr/Cr
Regards
Dear Venkataswamy,
Check this link,
http://wiki.sdn.sap.com/wiki/display/ERPFI/Product+Costing
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi sir,
a) WIP will be calculated,when Production order status reaches CONF or DLV and will be reversed in the next period.
b) Variance will be calculated when Order status reaches TECO or CLSD.
c) Order Settlement will result post calculated variance and also Order Settlement allowed when system statuses should be TECO and/or DLV.
Thanks for your valuable information and i have one more doubt
ofter doing WIP,Variance analysis and settlement, where it will be effected and how the accounting and costing document will be generated
regards
venkataswamy
Hi
In Cost Planning in Product Costing,We configure Cost variant
Costing variant is a A tool that contains all control parameters for costing, including
parameters that control how cost estimates are executed and the material
prices or activity prices that are used to valuate the costing items.
In Cost Object Controlling category a)by order b)by period c) sale order
a) BY Order,We create Co Production Order which will be used in Make To Order Production.
b) By Period,We create Product Cost Collector which will be used in Make To Stock or Repetitive Manufacturing
c) By Sale Order,We create sale order with linked to Co production order,We can use Make To Order Scenario.
www.sap-topjobs.com/SpecialPP/samplepc.doc -
Regards
Edited by: Dublin on Oct 19, 2009 10:02 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your valuable information
i got the all the information regarding the Make to stock (REM) SCENARIO
But i didn't get the information for make to order scenario.
Kindly explain the make to order scenario and what are the minimum configuration are required in this scenario
Regards
venkataswamy
Hi
In Repetitive manufacturing setup say glass manufacturing receives Bulk Order from Car Manufacturer and clients wants to analysis cost of this specific Order then you go for MTO scenario.
just have look at below link for production order configuration
Regards
Edited by: Dublin on Oct 19, 2009 12:23 PM
Hi
a) WIP will be calculated,when Production order status reaches CONF or DLV and will be reversed in the next period.
b) Variance will be calculated when Order status reaches TECO or CLSD.
c) Order Settlement will result post calculated variance and also Order Settlement allowed when system statuses should be TECO and/or DLV.
Regards
Edited by: Dublin on Oct 19, 2009 7:33 PM
Hi,
The two scenarios mentioned by you are standard SAP CO-PC .
Please read the help or go through these scenarios from Ideas examples given in 4.6c version OR read AC505 Training material.
Thanks - GS Rao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.