on 10-15-2009 10:15 PM
Hi Experts,
I have requirement to do the cross docking functionality for moving the stock from storage type 902 to storage type 100 when there are transfer requirement for production replenishment. I need to do one step cross docking. I wanted both option planned as well as opportunistic cross docking. Please let me know how can I configure this? I did the configurations and did not work.
I need to link my inbound delivery with the Transfer requirement that are created for the production supply replenishment.
Please let me know how can I achieve this? Appreciate your valuable input on this.
Thank you.
with regards,
Muthu Ganapathy.
Hi,
Check the following link,
http://help.sap.com/bp_bblibrary/600/Documentation/W71_BB_ConfigGuide_EN_US.doc
I hope this will help you.
Regards,
K.Annadurai.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Annadurai,
Thank you for your response. I have already configured based on this configuration guide. Still I could not make it to work. I could see my inbound delivery/TO as a plan document but I could not see my TR as a candidate document.
I did enable the cross docking configurations for the movement type 100 and for the movement type 101.
Please let me know if you can help me on this.
Thank you.
with regards,
Muthu Ganapathy.