Hi Guys,
I have a challenge: Install a ECC 6.0 with HR and an ERP 5.0 on the same Machine and Operational System. Do you know some documentation, link or tips for this type of case? Do I need run something different than a normal installation?
Best Regards,
Jader Coelho.