PR not created at component level for MRP area of storage location

103 Views

Dear Expert,

I have run MD01 with scope of planning (MRP area storager location) and system provide me result at MRP area. When performing MD04 at FG level, then system shows me result in MRP area storage location, however, in component level PR not created at MRP area storage location only at plant level. The following I have done in master data;

1. FG

- Assigned MRP area

- Assigned MRP type PD, MRP controller, and Lot sizing EX at MRP area segment

- Assigned Special procurement Both plant level and MRP area Segment

- Availability check 01

- Strategy 40

2. Component

- Assigned MRP area

- Assigned Special procurement Both plant level and MRP area Segment

- Availability check 01

- Strategy 10

- Collective requirement (2)

for individual component I can perform MRP area storage location

My question why system only provide me PR at plant level for my component?

Thanks in advance for your reply.

Best regards,

Mahnansa