Hi,

We need to copy only master data from prduction system to Qualtiy System, please suggest the procedure.

Thanks in advance

Joy garg

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

SAP TDMS is very help ful in such requirement where , you will get less down time, less efforts.

and data selection.

I will prerfer TDMS only.

Thanks

R.

Former Member
0 Kudos

Hi Jon,

Copying of Master Data is not possible using Profiles, As Master data is dependet on the Customisation structure. so only way of copying only master data is using either TDMS or LSMW or ALE method.

As if you see the Client structure master data depends on the customization of that particular client, and master data is client dependent so cant be transfered...

Thanks & Regards,

Balaji.S

markus_doehr2
Active Contributor
0 Kudos

> We need to copy only master data from prduction system to Qualtiy System, please suggest the procedure.

There is no standard procedure for this.

However, SAP has a separate product, TDMS (http://service.sap.com/tdms) to do exactly that.

Markus

Former Member
0 Kudos

Hi markus,

Thanks for you reply.

Could you please suggest if i used remote client copy through scc9 & select the profile sap_all, will that sopy master data along with other data?If yes, will it include transactional data alos?

former_member204746
Active Contributor
0 Kudos

yes, it include transactional data also.

Former Member
0 Kudos

Hi,

If instead of SAP_all, i select SAP_APPL profile, will that also solve the query.

Please sugget the following things related to copy also:

1) Our Production databse size is 430 Gb,Quality databse size is 410 gb.So how much time will the remote client copy will take approximately

2) Will the remote client copy will replace the old Quality data or it will append the data with producton data?

3) Will the remote client copy first copy the production data to quality & then will delete the quality data or will it first delete the quality data & then copy the production data as in our qulaity server there is space crunch.

Thanks in advance

Joy Garg

markus_doehr2
Active Contributor
0 Kudos

> Please sugget the following things related to copy also:

> 1) Our Production databse size is 430 Gb,Quality databse size is 410 gb.So how much time will the remote client copy will take approximately

Nobody can tell that. It depends on the number of parallel processes, the speed of your machine and the speed of the underlying I/O system.

> 2) Will the remote client copy will replace the old Quality data or it will append the data with producton data?

> 3) Will the remote client copy first copy the production data to quality & then will delete the quality data or will it first delete the quality data & then copy the production data as in our qulaity server there is space crunch.

The client copy will first delete the data in the QA system and the do the copy.

For such systems it would be much easier (and eventually faster) do a full system/database copy.

Markus

former_member524429
Active Contributor
0 Kudos

Dear Joy,

Unfortunately, It is not possible to only copy master data, as many tables contain both master and transaction data. Also, the difference between master and transaction data is not clearly defined and needs to be defined in each production environment, depending on the Customizing.

Moreover, Application data is dependent upon Customizing data. Therefore, the data can only exist consistently together with it.

Please refer following SAP notes. They will help you to get required information.

Note 24853 - CC-INFO: Client copy, functionality

Note 489690 - CC INFO: Copying large production clients

Note 67205 - CC-INFO: Copying large and productive clients

Note 19574 - CC-ADMIN: Controlling data selection during client copy

Regards,

Bhavik G. Shroff