Cm21 how include pegging in the dispatching of a production order

9 Views

Dear guru.

My company have three bom levels of in-house production material.

When I dispatch in CM21 a production order I need to see in the planning board the pegging , in order to synchronize the start/finish date of all the levels linked to the production order dispatched.

If i change the start/finish date of a production order when I dispatch it, the system must send a alert if another production order linked to the pegging of the dispatched order need to be rescheduled. The optimum it that allow to adjust directly in the planning board the date of this linked production order according to new rescheduling.

Does exist in SAP R/3 a chance to obtain this ?