HI all,
We have a material maintained in 2 plants, but the BOM is maintained in only one plant where it is produced. Now how can I cost the material in the second plant where the BOM is not maintained. There are lot of components in the BOM and all of them are not existent in the second plant where it is to be costed. What am I supposed to do?
Regards,
Sachin
Edited by: swing swiss on Oct 8, 2009 1:08 PM