Hi,

Pls advise how to use qm orders in recieving insp and also in in-process insp?

pls advise the steps / t-codes in each process.

Thanking u.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 07, 2009 at 08:33 PM

    Process Flow

    If you want to process quality-related costs in the QM component, the following steps are

    necessary:

    1. Create a QM order for the management of quality-related costs

    2. Confirmation of the quality-related costs (in the form of activity times) on the QM order

    3. Settlement of costs for the Controlling (CO) application component

    QM Order can be used for two types of costs

    1. Appraisal costs

    Record the costs on the basis of activity times. These are the times required to carry out an activity type for an inspection operation (forexample, setup, machine or labor times). In the CO component, the confirmed activity times for a QM order are converted to actual costs on the basis of predefined prices.

    2. Nonconformity costs

    In the QM component, you can only create a QM order. The system automatically assigns this QM order to the quality notification you are currently processing. The nonconformity costs are debited to the QM order in the CO component.

    Generally QM order type QL01 in the standard system will be used as

    long-term cost collector

    The order accumulates the costs on a lump sum basis for all the materials or inspection lots that are assigned to the order. You cannot, therefore, assign the costs to individual materials or inspection lots.

    Use Transaction QK04 for Order creation

    Use Transaction QK01 to create and Assign Material

    Use Transaction KB21N for activity allocation

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hello,

      You can use quality orders to capture the labour cost and assign it to the QM cost center but you can't capture the individal material cost. This is just an alternative for rework process as some of them may use prod orders for rework process.

      I am not ceratin if quality orders will be used for any other purpose.

      Regards,

      Akash

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.