activity cost-for each activity of individual operation

Former Member
0 Kudos

Hi, in co02, cost view, analysis, shows the cost of each activity of all opeartions. say, if we have 6 opeartions, it will show the setup cost, machine cost, labor cost individually for all 6 operations. if we wants to see setup cost (etc) of individual opeartion. what are the settings req for that. pls help.

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

KKBC_HOE or KKBC_ORD report you get all production order cost Plan /Actual.

Or for operational cost you need to develop report with the help of ABAP.

Regards,

R.Brahmankar

Answers (2)

Answers (2)

Anupam1143
Active Contributor
0 Kudos

HI

Check T code KRMI for the display ofactual cost line items for orders.

Regards

Anupam Sharma

former_member189817
Active Contributor
0 Kudos

Hi,

By setting filter in Order costing layout such a way to display setup alone and save as separate layout we can achieve this report.

Regards,

Velmurugan S