Skip to Content
avatar image
Former Member

Dynamic Modification problem

Dear Experts,

We have defined dynamic modification rule for a material at MIC level. There are totally 10 MICs . For the first inspection lot of this material this three MICs to be inspected . Then for the next 14 lots these MICs to be skipped from inspection .

Then for the sixteenth inspection lot these three MICs to be inspected. But system is skipping the sixteenth lot also. Please explain why it is happenening and what has to be done.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Oct 01, 2009 at 05:39 AM

    Hi,

    Pl check the skip stage in which check the number of skips. It should be 15.

    Thanks,

    Anil

    Add comment
    10|10000 characters needed characters exceeded