Error in CK40N

former_member324037
Participant
0 Kudos

Dear All,

While running CK40N error message: Object was not costed Message no CK 060. ( COSTING ).

when i see the error log : The field MBEW-HKMAT is defined as a required field; it does not contain an entry. message no: 144. Application are : MG. for the material: 401313 ( Selection ).

whereas in Struct. explosion error log: The field MBEW-HKMAT is defined as a required field; it does not contain an entry. message no: 144. Application are : MG. for the material: 401313

and Costing view for the material 4001313 in plant GGOP could not created. message no: 565. Application area: CK. ( Struct. explosion).

I have seen that particular material in materila master there is no view accounting and costing.

There are materials like this because of this reson im not able ot run CK40N. Pls suggest me what i need to do for this.

Best Regards,

Venkat.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

The Accounting and Costing view is required to be maintained for the Finished or Semi Finished material that you are costing through CK40N. The Valuation Class is required to be maintained in the Accounting1 view. In Costing1 view, the Profit Center, Costing Lot Size is required to be maintained. The Variance Key defaults based on configuration. The check boxes for With Qty Structure and Material origin (MBEW-HKMAT) need to be selected. MBEW-HKMAT helps in getting the material information alongwith the cost element.

With the above in place, when you run CK40N, the Standard Price will get updated in Costing2 view as well as Accounting1 view.

Sudhakar Shetty

former_member324037
Participant
0 Kudos

The 401313 materila is not in use but it is there is material list. Because it is giving the error in CK40N.

How could I rectifi these errors in CK40N.

when I run CK40N it should not show any error message.

Best Regards,

Venkar.

Edited by: venkateswarlu reddy on Oct 1, 2009 7:40 AM

former_member184655
Active Contributor
0 Kudos

Dear Venkat,

Check whether this material is present as a component in the BOM of the finished product or sub-assembly in CS03.

If means delete this component and then check in CK40N.

Regards

Mangalraj.S

former_member324037
Participant
0 Kudos

Dear Mangalraj,

This is Finished Product Material.

Best Regards,

Venkat.

former_member184655
Active Contributor
0 Kudos

Dear Venkat,

If it is a finished product means the material master must be containing the Accounting and costing views,so extend the

materials to these views using MM01 or else MM50.

After extending check in CK40N and revert back.

Regards

Mangalraj.S

former_member324037
Participant
0 Kudos

The error is appering only in COSTIN VARIANT : NTAX( MATERIAL COST AS PER TAX ) . when i go with costing variant : PPC1 ( STANDARD COST EST) error is coming, but coting is calculation we able to do up to ANALYSIS.

Where as we see in NTAX asme errors but in COSTING it is stoping with the error : OBJECT WAS NOT COSTED. message no . CK 060.

Best Regards,

Venkat.

Answers (0)