Hi all,

My problem is with a sales order having two schedule lines. Can someone pls let me know how the schedule lines are created in the sales order.

Accepted Solutions (0)

Answers (6)

Answers (6)

Former Member
0 Kudos

A Line item can have more than one schedule line mostly because of the stock availability, if it is partially confirmed, that confirmation quantity will be seen on that date along with the expected confirmation date on the balance quantity in the second line ( this will be based on the incoming stock based on the Purchase order or production orders or even through RLT).

The other scenario would be as per the customer requirement, if a customer had asked for 100 qty in total for a month and if he wants 25 pieces every week, we can manually key in these dates at the schedule line level. which then will calculate the other related dates to enable the delivery

former_member217082
Active Contributor
0 Kudos

Hi i

In a sales order , having two schedule lines can take place if the stock is not confirmed.on that delivery date So check the Delivery date and in the next line check the delivery date. The confirmed date delivery date will be different and system will calculate , based on the data we maintain. like RLT ,. Lead time in days, shipping point details we maintain. Based on that system will determine and give the confirmed delivery date in the next line

Regards

Srinath

ajitsingh6
Active Contributor
0 Kudos

Dear

It is very simple based on your ITEM CATEGORY proposed in Sales Order and MRP TYPE we maintained in Material Master.

Regards

Ajit K Singh

Former Member
0 Kudos

Hi Friend,

Schedule line states about the CONFIRMED QUANTITY And the Delivery date.

Means on which date the Quantity ordered by customer can be available to deliver.

The Schedle line configuration will be done in VOV6

This schedule lines control

1. Whether any Delivery block can set

2. The movement type for the delivery

3. If there is any Purchase requisiton needs to be created or not

4. It also control the MRP , Transfer or Reqirements and Availability check for the material

The Schedule lines will be triggered automatically in the Sales order with the some configuration in VOV5

This is how the schedule lines determined (VOV5)

The controls is

ITEM CATEGORY in the sales order

MRP type which is set Material master.

Hope it is clear,

thanks,

santosh

Former Member
0 Kudos

Hi there,

Schedule lines are confirmed based on the schedule line catg proposed for the line item. For a particular schedule lines, basing on the VOV6 settings, availability check will be carried out taking into consideration the RLT. Accordingly confirmed material availability date will be proposed.

Regards,

Sivanand

former_member188076
Active Contributor
0 Kudos

Hi

Scedule Lines are created automatically and it is based upon the availability of material.

Check the forum for Availability and Scedule Line and you will get lots of documents.

Regards

Amitesh Anand