Skip to Content
author's profile photo Former Member
Former Member

MM-MDM-XI-sus

Hello Gurus,

We have a scenario wherein I need to clean the data in MDM(from multiple r/3 systems) and then create a po in multiple MM (with the same material code)systems and transfer the same to sus.

Can you please tell me the process flow.

MDM will be used to clean the data and consloidate the material codes from different MM systems

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2010 at 09:30 AM

    resolved

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.