Skip to Content

HUM : How to change the HU predifined in TO

Hi,

For the picking process, the business need to choose witch HU he wants to prepare.

If i use the strategie "L" , the system propose an HU but its not possible to change it.

If i use the strategie "B" , the system doesn t propose HU but i have to manage 1 bins per material/batch.

Do i have any solution in the standard SAP ?

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.