Skip to Content

Assign PO output control VOFM routine with BRFPlus

In the NACE output determination, it is possible to assign PO output control VOFM routine via Output control node ==> Message Types ==> Message Determination Schemas==>Define Message Schema for Purchase Order==>Select Assign Schema to Purchase Order.

How can we manage the same setting with BRFPlus? Where to maintain the routine number?

Add a comment
10|10000 characters needed characters exceeded

Related questions

0 Answers

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.