on 09-19-2009 7:37 PM
Hai Gurus
In SRM 210 on Plan Driven Procurement i found two sentences
1.To get PR in the Work list for P.O in Sourcing,Local Purchasing Group required with "Responsibility" for the entry channel and product catalog of Backend Requisitions
2.View table V_t150pr determines which material Group and Purchasing Group are grouped into a profile.
So what i understand is, to process PR in EBP we need Local purch Group.But in tableV_T160PR we need to give R/3 purchase Group Or EBP purchase Group
Thank u in Advance
Chandra
Hi
you have enter Ecc Purchasiing Group in table : V_T160 PR in ECC 6.0
and in the Table : V_T160EX -Material Gourp and purchasing Group in ECC 6.0
Run the Report BBP_EXTREQ_TRANSFER
the P.R will be transferred to SRM
Regards
G.Ganesh Kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
You have to maintain ECC PGrp in the tableV_T160PR.
Hope this helps.
Thanks
Ashutosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.