cancel
Showing results for 
Search instead for 
Did you mean: 

ATP Rescheduling process - Program SDV03V02

Former Member

Hi ,

Any one have idea Is there any new program avialble in ECC6.0 for Rescheduling process insted of Program SDV03V02

with different selection options as below mentioned.

The standard ATP Rescheduling process (SAP Transaction V_V2 - Program SDV03V02) currently only provides 2 data selections: Material number. Plant

Following specific areas we need additional selection criteria:

1.The ability to select the Sales Order Types to be rescheduled.

2.Currently, when we use this program to do rescheduling Sales Quotations are also getting rescheduled which we do not want 3.The ability to select Requested-Delivery-Date range.

Our current rescheduling process takes too much time as well as creating an enormous volume of SD Change-log records which causes much frustration by our users searching through order change records.

Is there another standard SAP Rescheduling program with more selection/functionality in ECC 6.0?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Try Using V_RA T-code it mode selction paramerter and might help .

Former Member
0 Kudos

Hi,

Many People have the same requirement. But this is what SAP Suggested in the FAQ for this transaction .

2. Question:

The existing selection criteria and filter criteria are insufficient. What

can I do?

Answer:

The manual backorder processing offers enhanced options in APO. In

the R/3 System, however, you can copy report SDV03V02 and use your

own selection there. SAP regards this report as a template only. The

requirements of individual customers are too numerous and too

unspecific to offer them in the standard system.

Refer to OSS NOte : SAP Note 549064 - FAQ: Rescheduling/backorder updating in

R/3

But there are Numerous Performance Improvement Solutions Provided by SAP .

Refer to the below OSS notes with regards to that.

Note 153667 - Performance SDV03V02.pdf

Note 31957 - Performance Rescheduling (SDV03V02).pdf

Note 822884 - Performance improvement for rescheduling.pdf

Note 847986 - Rescheduling performance.pdf

Note 90230 - Performance of rescheduling.pdf

Thanks

Srini