Scheduling Problem at the Project Level.

Former Member
0 Kudos

HI Sir, this is Gagandeep Singh. Sir I am facing a problem during re-scheduling. I am explaining the following scenario which I had done.

I had created a Standard Project through T code CJ92, which includes networks, network activities, relationship of the activities etc. Now i am creating the project by copying the standard template using T code CJ20N. Once the project structure is created, now I am Scheduling the Project level for this I am using two Scheduling Scenario, first I am using Top-down Scheduling Scenario & then after Top-down I am using bottom up Scheduling Scenario. Till now every thing is going fine like Gantt chart, Basic dates of the WBS etc. Here my Query is raised, when I am changing the duration of the activity & then again I am re-scheduling the Project level using Bottom-up Scheduling Scenario the system is calculating the Latest Start Date in the Basic Date instead of earliest start & also my Gantt chart is also showing the backward dates.

Sir Please suggest what to do in type of scenario.

Please response ASAP

Regards,

Gagandeep Singh.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

HI Sir, this is Gagandeep Singh. Sir I am facing a problem during re-scheduling. I am explaining the following scenario which I had done.

I had created a Standard Project through T code CJ92, which includes networks, network activities, relationship of the activities etc. Now i am creating the project by copying the standard template using T code CJ20N. Once the project structure is created, now I am Scheduling the Project level for this I am using two Scheduling Scenario, first I am using Top-down Scheduling Scenario & then after Top-down I am using bottom up Scheduling Scenario. Till now every thing is going fine like Gantt chart, Basic dates of the WBS etc. Here my Query is raised, when I am changing the duration of the activity & then again I am re-scheduling the Project level using Bottom-up Scheduling Scenario the system is calculating the Latest Start Date in the Basic Date instead of earliest start & also my Gantt chart is also showing the backward dates.

If I make any changes in my networks that should be automatically updated in my WBS element.

Sir Please suggest what to do in type of scenario.

Thanks & Regards,

Gagandeep Singh.

nitin_patoliya
Active Contributor
0 Kudos

I back on Ahmed. Gagan, please read rule of engagement. Here in forum all are consultant. As professional please stick on our basics. Forum will surely help you. If you stick to rule of engagement.

With Regards

Nitin P.

former_member203108
Active Contributor
0 Kudos

your previous message was locked.. because you used the word ASAP... now again you are using the same...Please follow the rules.