Skip to Content
author's profile photo Former Member
Former Member

Enhanced Receiver determination - for Integration Process

Hi,

Just wanted to confirm that if it is possible to have more than one Receivers, with Enhanced Receiver Determination and one of the Receiver happens to be Integration Process. I know with Enhanced Receiver Determinations you can find more than one Receivers at Run time, however the key question is, if in addition to normal Receiver Systems (like SAP R/3 or Web Services etc), if we can also kickoff Integration Process within Enhanced Receiver Determination.

Thanking in advance.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 09, 2009 at 06:43 PM

    Hi SR,

    Techincally I think we can define. But if you want to use the Integration process you use abstract interfaces, but for others you dont use this.

    Regards,

    ---Satish

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thanks,

      I understand about the Abstract Interfaces. The fact is that we are already using Integration Process. Currently it is straight forward with normal Receiver Determination. However, now the requirement is in addition to Process Integration, we want to another Receiver as well and I was thinking to use Enhanced Receiver Determination.

      Has anybody this.....?

  • Posted on Sep 10, 2009 at 06:54 AM

    Hi,

    this is absolutly no problem, a BP can be one of several receivers.

    The enhanced receiver determination is used if you want to find the receivers dynamicly that means dependend from the message content. If the receivers are fixed, you just can add them into the "normal" Receiver Determination.

    Assumedly the different receivers are using different Inbound Interfaces (a BP is using an Abstract Interface). Therefore you would need for each different receiver a own Interface Determination referring a own mapping.

    Regards,

    Udo

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 10, 2009 at 09:37 AM

    as said by Udo Martens

    Assumedly the different receivers are using different Inbound Interfaces (a BP is using an Abstract Interface). Therefore you would need for each different receiver a own Interface Determination referring a own mapping. 
    

    refer this wiki http://wiki.sdn.sap.com/wiki/pages/pointstab/viewpageversion.action?pageId=131760630&version=5 to Know how to configure Enhanced receiver determination and Interface determination for each receiver .

    In your case one of the receiver will be Integration process

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.