prt confirmation in production order

hi, created an equipment, assigned one measing counter to it. we assigned this equipment as prt in prod order. pls adise how confirm the no of strokes done with this prt during confirmation of production order?

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • avatar image
    Former Member
    Sep 09, 2009 at 05:32 PM

    Hi Yadav,

    1. Case 1 :-Without assigning the PRT to routing in PP if order to be updated automatically on confirmation of production order then

    link the final product material to eqpt in IE02 under serial no tab ... thus on confirmation in PP it updates the measurement counter for eqpt in PM . Follow this scenario (http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.htm) Performance base production confirmation .. Thus this updates the counter and you can further have MP and proceed for maintenance

    2. Case -2 Assigning the EQPT PRT to rounting in PP here you need to maintain data in PRT tab in IE02 like control key , formulas etc to calculate the PRT usage value and need again to maintain counter ...and while assigning in PP you need to mention the usage value .. for details refer this (http://help.sap.com/saphelp_470/helpdata/en/89/a427e9461e11d182b50000e829fbfe/frameset.htm) Maintenance planing for PRTs ..

    regards

    Pushpa

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Girish Adaviswamy

      sir, it is updating the counter after confirmation. but if i confirm 1 qty, it is updating by 10. pls note that in ik01, i mentioned annual estimate as 10, counter over reading as 100. even i change annual estinmate to 1, system not accepting that figure. pls advise what need to be mentioned in annial estimate and counter over reading fields? any where i need to do settings?

      Edited by: ys yadav on Sep 15, 2009 1:00 PM

  • avatar image
    Former Member
    Sep 10, 2009 at 04:14 AM

    Hi ,

    The quantity you mentioned at the time of assigning PRT in routing according to the base qty, that qauntity will create measuring document at the time of confirmation.

    Each time you will confirm that order a measuring document will be created which will update the counter of measuring point.

    So the counter in measuring point will give you the amount of material created till date.

    Regards,

    Vishal

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 16, 2009 at 04:06 PM

    problem has been solved by changing the formula for usage.