Hi, during design stage, design dept personnal like design engineer,manager and deputy manager of design dept supervises the first part production in shop floor. we want to capture thier time also in same production order. any options available in pp area other than capturing through over heads. can we capture this in any other module. pls advise.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 09, 2009 at 05:13 PM

    capture them as an activity type in routing,

    and do the confirmaition with exact time.

    it should be ok

    keep note: you can not have more than 6 activity types.

    Pravin Mukkawar

    TCS canada

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.