on 11-18-2016 12:13 PM
Hi Experts,
In our warehouse, we have different plants connected to same warehouse, but each plant stock is managed in same storage types as below.
Plant SLoc WH Storage Type Bin
1000 LOC1 001 001 01-01-01
1001 LOC1 001 001 01-01-01
In this scenario, users want to transfer stock from Plant to Plant directly in same storage bin WM.
Request your inputs on how this can be configured.
Thank you
As far as configuration is concern you can find the setting under below mentioned node
IMG----LE---WM---INTERFACE---INVENTORY----Define Movement type---LE WM INTERFACE TO INVENTORY MANAGMENT
Why Posting change notice(PCN) - if you make any change in the quant characteristic (Storage Location / Plant / Batch/ Material / Special stock / stock category) system create PCN. in your case you want to change the plant hence you have to adopt the PCN route
You have to complete the task in two step (First perform the task in Inventory management using T-CODE : MIGO_TR and then perform the subsequenct activity in WM)
Step 1 ) MIGO_tR (MvT : 309) - As a result of MIGO_TR, system create material document and internally the Posting change notice
Step 2) use LT06 enter the Material document which will internally call t-code LT05 - Create TO agains the PCN
PCN is a logical movement in system only and no physical movement is required
Specify the Storage bin which stock you want to convert (This is only logical transfer in the system and no physical movement required )
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Here is more information from SAP Help Posting Change from Plant to Plant
If you are not moving bins for this type of posting change, and this is going to be a common movement, instead of manually doing the LT06, set up Automatic TOs. The instructions are here - Automatic Creation of TOs for Posting Change Notices
Personally, I would use the 301 Movement Type for this, so that you can differentiate and not create Automatic TOs for 309s - in case you will use that later for a true material to material or batch changes where you might have to actually move the material or relabel, etc. (in essence treat different from the plant to plant movement).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Had you already tested, what was its result?
In MM you just do a 309 movement to change the plant, and since both plants are managed in the same warehouse SAP should by itself create a PCN instead of a TR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.