cancel
Showing results for 
Search instead for 
Did you mean: 

Multiple init in COPA

Former Member
0 Kudos

HI !

I have account based COPA Datasource which pulls data for 5 controlling area of the same operating concern .

I can do 5 init with different selection on controlling area . But will the delta pull data for this 5 controlling area ?

I have tried to run a single init with these 5 controlling area and the load failed .

Moreover , if I do 5 different init then delta will be pulled from the last time stamp . In that case there is a possibility od data inconsistency.

Please suggest .

Should I have to create diiferent DS for different controlling area ?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

HI,

Init delta with five different selection condition if sucessful then delta for this five selection condition will get combined.

No issues will be in that.

Hope this helps for you

Thanks,

Arun