Synchronisation Points Post System Copy

Hi Gurus,

Can anyone pl. provide inputs on :

- What is Synchronisation Point after System Copy ?

i.e. Say if ECC PROD system is copied to ECC QAS. After this what steps ( High Level Overview ) needed to ensure that

connected systems perform ok ?

Any / ALL Inputs are welcome and highly appreciated.

Many Thanks,

Best Regards,

- Ishan

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 07, 2009 at 08:55 AM

    Post system copy steps are defined on the system copy guide.

    Also theres lots of information about this already.

    Please do some research before posting.

    Regards

    Juan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.