Costing Of Configurable Material

We have a scenario here.

We create the sales order in the sales Plant

We do a STO to Production Plant where explode the BOM which has an configurable sub-assembly

When we run an MRP this creates a another STO for the configurable material to be produced in the supplying plant.

Now, the questions are

1) How do I create the cost estimate for the configurable material

2) How do I get it to reflect in my parent order.

Thanks

Siva

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Posted on Sep 08, 2009 at 04:12 AM

    Dear Siva,

    In the case of configurable material,they will be having a super BOM and super Routing defined with object dependencies.

    To do the costing for configurable material you can use T code - CU50 (configuration simulation)

    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant

    production and do the costing and check.

    Also check this SAP link to explore more on this topic,

    http://help.sap.com/saphelperp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm_

    Also check this thread

    ck11ncosting-done-for-configurable-material-is-thr

    material-xxxxx-in-plant-xxxx-is-configurable-and-w

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 08, 2009 at 03:35 PM

    Hi Siva,

    the sales order cost estimate will always do a multi-level explosion and will take the actual configuration into account. When you maintain the production plant as the source of supply for the sales plant and when you enter the actual configuration properties into the sales order ,the sales order cost estimate should work in the scenario correctly. No standard cost estimate for the configurable material will be necessary. The goods movements will take the standard price estimated from the sales order into account.

    best regards, Udo

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.