When in CM21(Graphical view), I'm successfully able to dispatch an order to it's specific work center. However, when I'm in CM22 (Tabular view), I cannot dispatch an order to a work center. I only recieve the error "You should check the planning log".

Am I going about dispatching the wrong way? When in CM22, what is the process to successfully dispatching an order to a work center? Please describe in detail how to divide up an order from ONE overloaded work center to MULTIPLE dates or work centers.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 03, 2009 at 03:04 PM

    Compare dispatch straegy in both transaction. CTRL+F1 to bring up strategy screen. Or click on "settings" in them menu and then on "strategy".

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      No gaps field does not matter for normal tabular leveling, that is why is it un-editable. And you seem to be using standard SAP settings for leveling. Please try to dispatch other orders and check your results. Also, check in the production order which is causing error for capacity requirements, maybe it is not released or already completed.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.