Storage location in Production order

In planned order iam getting some storage locations for components in component list but when i convert planned order into production order then storage location for components changes .

Please guide what causes this change in storage location from planned order to production order.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 03, 2009 at 01:53 PM

    Hi,

    If Storage location is changing when converting planned order to production order, then check if there is an active implementation of the user exit PPCO0005 This exit is used to change Storage locations when order is created.

    Take the help of your abaper for this.

    Regards,

    Vivek

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 03, 2009 at 02:18 PM

    Hi,

    Keep storage location for component material issue in BOM , production version and material master same.Also check that the data in APO if you are using APO as planning tool.Please also check the storage location maintained in planned order for components by going to components details of planned orders.

    Hope this can help.

    regards,

    kaushik

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 04, 2009 at 07:16 AM

    HI

    Plz check in Material master of components in work schedulling view you have maintained the production storage location and in BOM of header material under item details production storage location both are same or not .if no then maintain the loction which you want to issue the material either same in both or maintain only in material master or in BOM

    Hope it will help you

    Regards

    Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.