Skip to Content
author's profile photo Former Member
Former Member

How the Block to do changes in partucular BOM Assemblies

Dear Expert,

In our scenario BOM variant are there for country specific. so my client requirement is once they freeze Bill of Material (BOM) i.e. particular date for single country variant then no changes can be made for this country specific variant up to one month or some period.

Second requirement is if they want to do some changes in same variant after some days then this change should not be reflected now this chnage should reflected after one month or after some period i.e. from BOM Freezing date. so please tell me any standard functionality is there or if not possible then how we do this development.

Regards,

Ishwar

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Sep 03, 2009 at 10:37 AM

    Ishwar,

    Explore the use the Engineering Change Management concept of change number and correct authorisation control for approving the change numbers.

    Regards,

    Prasobh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 04, 2009 at 11:41 AM

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.