Activity cost in COPA

Hello ALl,

How we can map activity type cost of product costing in COPA report.

Suggest

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Sep 03, 2009 at 04:35 AM

    Hi,

    You can assign value fields for cost component structure in respect of the material cost estimate. By doing this, the material cost component can be viewed in the COPA reports.

    As regards, the actual activities, once the same is confirmed on the production order, and when you settle the production orders, the variances would be posted to copa. for this you need to maintain PA transfer structure for prodution variances..

    Trust this helps much.

    Cheers

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello Suryanarain,

      I agree with swapvik but my question how to map it,

      I had assigned the primary cost element of all consumption a/c in OKB9 and ticked the profitablity segment but this setting capture the bom cost to COPA how to ca[pture direct labour cost and other over head cost which comes from secondary cost element, whether i had to create ann COPA assessment cycle or any other way.

      Suggest,

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.