    Following steps need to be follow for configuring MRP

    1. Plant Parameters for MRP (SPRO)

    2. MRP type (MM)

    3. MRP controller (MM)

    4. Procurement Type(MM)

    5. Special Procurement Type if applicable (MM)

    6. Lot Sizing Procedure (MM)

    7. Scheduling Margin Key(MM)

    8. Scheduling Parameters for planned orders through (SPRO)

    Detail:

    1. Activate Plant Parameters for MRP(in SPRO)

    2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission)

    3. MRP Controller (in SPRO)

    4. Production Scheduler Profile (in SPRO)

    5. Order type Dependent Paremeters(in SPRO)

    6. Plant Parematers(in SPRO)

    7. Scheduling Parameters(in SPRO)

    Important T-Codes - OPL8,OPJH,OPKP

    Note: Go to SPRO, select reference IMG,

    Select Production - Material Requirements Planning, Here you will get all the details about the setting for MRP

    by

    Prabhu

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 01, 2009 at 10:52 AM

    Hi Prasad,

    At first u need to activate MRP in the below path:

    Spro-MM-Consumption-Based Planning Planning Activate Material Requirements Planning

    Later Maintain the material with all 4 views of MRP.

    Steps with Demand Mgmt 😔 Sequence ) MC87

    MC78

    MC74

    MD04

    MD02

    Steps withOUT Demand Mgmt 😔 Sequence )

    MD61

    MD04

    MD02

    Regards

    Ramesh Ch

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 01, 2009 at 11:55 AM

    Dear,

    Please refer this link,

    [MRP Configuration|http://www.sap-topjobs.com/SpecialPP/overviewdoc.pdf]

    Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Sep 03, 2009 at 05:30 AM

    HI

    Gurus, I am having MRP presentation at ICE cream manufacturing factory on Monday. Can you Pl help me to prepare the presentation, mainly the advantages of MRP implementation, I have to convince my client to implement MRP, at present they r all doing manually in Excel. They might thing itu2019s a extra work for them, also guide the client side questionnaire and the pres steps to implement MRP in the factory. It would be so helpful if u reply. Thanks for ur efforts and time

    Add comment
    10|10000 characters needed characters exceeded

  • Sep 03, 2009 at 06:29 AM

    Dear Prasad,

    Front End settings:

    1.MRP type,MRP controller,Planned delivery time(for externally procured items),In-house production time(for inhouse

    manufactured products),Floats (Scheduling margin key),Lot size indicator,factory calendar if used,Planning strategy,BOM

    selection method.

    All these settings to ne made in MRP1,2,3,4 views of the material master.

    SPRO settings,

    1.In OPPQ plant parameters for carrying out planning run.

    2.In OPPR for the MRP group parameters.

    3.Activate MRP areas if used any

    4.Activate MRP for plant,Planning file entries (OMDU and MDRE) - you can check by branching this menu ->SPRO ->production-

    -->MRP --->master data.

    5.if you want to use MRP area check this link,

    MRP Area

    mrp-run

    Main MRP settings

    looking-for-notes-on-mrp

    Steps for carrying out MRP for multiple plant

    mrp-in-multiplant

    Regards

    Mangalraj.S

    Add comment