on 09-01-2009 11:28 AM
Plz give me configuration steps for MRP
Hi,
Following steps need to be follow for configuring MRP
1. Plant Parameters for MRP (SPRO)
2. MRP type (MM)
3. MRP controller (MM)
4. Procurement Type(MM)
5. Special Procurement Type if applicable (MM)
6. Lot Sizing Procedure (MM)
7. Scheduling Margin Key(MM)
8. Scheduling Parameters for planned orders through (SPRO)
Detail:
1. Activate Plant Parameters for MRP(in SPRO)
2. MRP Type Customization(E.g, PD, M1,M2,, -in SPRO - But need not suposed to do without client's permission)
3. MRP Controller (in SPRO)
4. Production Scheduler Profile (in SPRO)
5. Order type Dependent Paremeters(in SPRO)
6. Plant Parematers(in SPRO)
7. Scheduling Parameters(in SPRO)
Important T-Codes - OPL8,OPJH,OPKP
Note: Go to SPRO, select reference IMG,
Select Production - Material Requirements Planning, Here you will get all the details about the setting for MRP
by
Prabhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Prasad,
Front End settings:
1.MRP type,MRP controller,Planned delivery time(for externally procured items),In-house production time(for inhouse
manufactured products),Floats (Scheduling margin key),Lot size indicator,factory calendar if used,Planning strategy,BOM
selection method.
All these settings to ne made in MRP1,2,3,4 views of the material master.
SPRO settings,
1.In OPPQ plant parameters for carrying out planning run.
2.In OPPR for the MRP group parameters.
3.Activate MRP areas if used any
4.Activate MRP for plant,Planning file entries (OMDU and MDRE) - you can check by branching this menu->SPRO->production-
-->MRP --->master data.
5.if you want to use MRP area check this link,
MRP Area
Main MRP settings
Steps for carrying out MRP for multiple plant
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI
Gurus, I am having MRP presentation at ICE cream manufacturing factory on Monday. Can you Pl help me to prepare the presentation, mainly the advantages of MRP implementation, I have to convince my client to implement MRP, at present they r all doing manually in Excel. They might thing itu2019s a extra work for them, also guide the client side questionnaire and the pres steps to implement MRP in the factory. It would be so helpful if u reply. Thanks for ur efforts and time
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Please refer this link,
[MRP Configuration|http://www.sap-topjobs.com/SpecialPP/overviewdoc.pdf]
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prasad,
At first u need to activate MRP in the below path:
Spro-MM-Consumption-Based PlanningPlanningActivate Material Requirements Planning
Later Maintain the material with all 4 views of MRP.
Steps with Demand Mgmt Sequence ) MC87
MC78
MC74
MD04
MD02
Steps withOUT Demand Mgmt Sequence )
MD61
MD04
MD02
Regards
Ramesh Ch
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.