Hello Experts,
I have run standard cost estimate with t-code ck11n for the material codes.BOM is open. But standard cost is not included activity cost. And I have check routing and it is available to run standard cost estimate.
Can any one say what are the things to be checked if the above problem occur.
Regards,
satish