Skip to Content
author's profile photo Former Member
Former Member

Report availability control Project

Hello,

Is there a standard report which shows who and when activates and deactivates the control of availability of a project?

Regards and Thanks.

Edited by: Rubén Rodríguez Tenorio on Aug 28, 2009 1:07 AM

Edited by: Rubén Rodríguez Tenorio on Aug 28, 2009 1:10 AM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 28, 2009 at 05:55 AM

    hi

    No.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.