The customer wants to defer revenue through the project period example $6000 for 6 months.

I have scoped it in business configuration and finetuned in accural method determination.

My question is the step by step guide as to how the customer can post $1000 for each month for the 6 months in the system.

Please assist

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Sep 26, 2018 at 07:38 AM

    Hello Chinedu,

    I guess you are using services of item type "fixed-price (project)", right?

    If so, there are various options (all to be executed in WOC Cost & Revenue, Sales Document Items):

    1) Assign accrual method "Cost-to-Cost Proect POC". This allows either to track the progress based on time / expenses posted to the project (assuming this is linear throughout the months) or you can manually add a schedule by assigning either a manual POC.

    or

    2) Assign accrual method "Based on manual amounts", then enter a schedule on revenue and costs to be realized in "Edit Manual Revenue Recognition Data" > "Recognized Costs and Revenues".

    Best regards,

    Thomas

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.