Hi,

When we create PP Work center through CR01 can we assign the asset number ?

or while creating asset number through AS01 can we assign the PP Work center ?

Our major issue is

FI : ASSET

PM:Equipment

PP: Workcenter

we are not able to link . we need to have same cost center for all the three . but as of now we dont have the link for the three and what ever cost centers we assignsystem is accepting

how to solve this ?

i could not find any fields in work center either to assign asset or equipment ?

only in equipment i can give PP work center but how it links all the three Asset , Equipment and Work center ?

regards,

madhu kiran.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 27, 2009 at 07:08 AM

    duplicate question

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.