Skip to Content
0
Former Member
Aug 27, 2009 at 06:06 AM

How to assign Asset number to PP work center -reg

19 Views

Hi,

When we create PP Work center through CR01 can we assign the asset number ?

or while creating asset number through AS01 can we assign the PP Work center ?

Our major issue is

FI : ASSET

PM:Equipment

PP: Workcenter

we are not able to link . we need to have same cost center for all the three . but as of now we dont have the link for the three and what ever cost centers we assignsystem is accepting

how to solve this ?

i could not find any fields in work center either to assign asset or equipment ?

only in equipment i can give PP work center but how it links all the three Asset , Equipment and Work center ?

regards,

madhu kiran.