Skip to Content
0

Create Batch with Reference no longer working in ECC 6.0

Nov 17, 2016 at 09:36 PM

79

avatar image
Former Member

We have a need on occasion to create material/batch in MSC1N with reference to another Material/Batch, where the classifications assigned to the two materials are different. Prior to our upgrade to ECC 6.0, we had no problem doing this. Regardless of the Classification assignments, so long as the two materials had common characteristics, those results from the reference material/batch would copy over to the new material/batch. Since our upgrade to ECC 6.0, however, it is not working. Instead, we get a warning that "Classification for Class Type '022' was not copied from the template" followed by a hard error: "Inconsistency in classification data - Transaction terminated."

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Arijit Banerjee Nov 18, 2016 at 12:52 PM
0

Hi,

Please can you check what is the level at which batch management is now active in ECC? For more details, please go through the below WiKi - https://wiki.scn.sap.com/wiki/display/PLM/FAQ+during+batch+level+conversion

Share
10 |10000 characters needed characters left characters exceeded