cancel
Showing results for 
Search instead for 
Did you mean: 

SETTINGS RELATED TO MM AT ECC6 SIDE

Former Member
0 Kudos

Experts can any one send the settings which we have to perform at ECC6 side to extract the MM data in BI using LO extractor

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

In R/3 install the Business Content datasource 2LIS_03_BF. Once the datasource is installed, create the mapping to BW with standard or generic BI objects based on your requirement.

Delete the setup table using Tcode LBWG.

Fill the setup table for Material movement using Tcod OLI3BW based on posting date. Once setup table is filled you should able to pull data to BI.

Hope this helps you.

Former Member
0 Kudos

Hi,

The above said is for pulling data as full update(basically history data), In case if you need to initialize and setup a delta from ECC6 to BI, you need to go through more procedures.

You need to get a system outage and need to lockdown all the users. Then you need to initialize the delta between ECC6 and BI. Once initialized going forward all the future MM posting will be captured in Delta.

The historic records can be pulled to BI as mentioned earlier by filling setup tables and as full update.

Hope this helps