system propose changer number used in other plant when i change BOM

Dear All,

I have engineering change number.

When i want to change the component in the bom in my plant,system give the the change number which is already used by other plant.

Why the system propose the number which is used by other plant.

For your information" this number is assigned to my plant as well as other plant"

is this going to create problem if same change number is shared by two plants?

Is this a standard behaviour of the system or this is system error?

What is the solution for this.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Sep 04, 2009 at 11:09 AM

    Hi,

    If you have used one changed number to make the changes for the BOM of multiple plants then this will happen.

    to avoid this you can give only one plant in the CC02 ( change master).

    so this can be avoided.

    Also for all PP issues kindly post in the SAP-PP forum.

    this will give more visibilityfor your problems

    reg

    satheesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.