Skip to Content
author's profile photo Former Member
Former Member

break down activity

Hai gurus,

My problem at client end is.

1) Under standard value key i had to include machine break down and power break down.

2) How to define the parameters and formula for the above.

waiting for the positive reply.

regards,

sekar chand

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 26, 2009 at 05:33 AM

    Hi Sekar,

    The other workaround can be :

    1. For breakdown you can create a notification in IW21 against that machine - equipment and mark the breakdown tick .. here you need to enter the malfunction start date and once breakdown is completed you can enter the malfunciton end date and time and this captures the breakdown hrs,

    2. For capturing power shutdown you can again create a separate notification type in config under PM module for this and capture the down time in breakdown hrs ..

    i guess this would be helpful

    regards

    pushpa

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi

      1. Notification can be categorised based on notification types M1,M2,M3 .They are used to report the fault associated with the machine and record the downtime due to the fault . Here down time can be captured through breakdown hrs

      2. You can create notification in IW21 tcode and enter machine no -->eqpt no , mark the breakdown tick mark .

      3. In IW22 you can then release the notification .Again once the fault is rectified you can enter the malfuntion end time in IW22 and then close the notification . Thus based on date and time entered in malfuntion end and start the breakdown hrs are calculated . Note the system takes system time as reference for breakdown hrs calculation .

      plz refer the link (http://help.sap.com/saphelp_47x200/helpdata/en/b0/df293581dc1f79e10000009b38f889/frameset.htm)

      regards

      pushpa

  • author's profile photo Former Member
    Former Member
    Posted on Aug 26, 2009 at 04:54 AM

    Dear

    Stanard formula will not help much for you in down time case

    As per my opinion you can develop ztable in co11n screen and in ztable define downtime code,employee name and actual time

    During confirmation employee manitain down time code and time taken and his name so you can have accurate data of downtime

    Becuse down time is not fixed time like operation time it should be maitened whenever it occurs and in standard value key you are maintening fixed time like machine time,set up time,power consumption etc.

    Regards,

    vidyasagar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.