Dear PP Consultants,

This is regarding the TRLT field functionality during availablity check of Sales Order.

I understand the TRLT field is defined manually in Material Master MRP-3 view as the sum of the longest lead time of raw material, in-house-production time and floats.

If during the availablity check of Sales Order, the raw material which is having the longest lead time is already available in stock, can the system calculate the TRLT dynamically and propose the delivery date in sales order only based on in-house production time??

Is there any setting that can be made so that during availability check of Sales Order, the system considers the stock of raw materials and then propose the confirmed dates?

Your early respose is much appreciated. Thanks a lot in advance for your valauble suggestions.