on 08-20-2009 8:37 AM
Dear Experts,
Wei have installed a HA Load Balanced PI Production Server with the below specifications. Its a four node cluster. Two nodes for Application Cluster and another two nodes for Database Cluster.
Node1
Physical Hostname : axsappci
Virtual Hostname : axsapp00
Instances : CI,SCS and ASCS.
Node2
Physical Hostname : axsappdi
Virtual Hostname : axsapp00
Instances : Dialog instance installed with physical hostname axsappdi
Node3
Physical Hostname : axsappd1
Virtual Hostname : axsappdb
Instances : DB Instance.
Node4
Physical Hostname : axsappd2
Virtual Hostname : axsappdb
Instances : Standby DB Instance (passive).
Web Dispatcher Hostname : h2h
Application Switchover : CI,SCS and ASCS to switchover to Node2 and dialog instance Node2 forcing to go down
Database Switchover : DB Instance switchover to Node2 if Node1 fails.
We have changed all the parameters according to note 951910 -> NW2004s High Availability Usage Type PI
I am facing an issue with the cache Notifications in the Integration Repository and Directory. The cache notifications are not happening properly particularly with the ABAP Cache.
I get the below error in my ID when i try to do the manual cache notification.
Unable to notify integration runtime (ABAP) of data changes
Unable to establish http connection "http://h2h:8002/sap/xi/cache?sap-
client=001"
Kindly assist.
Thanks and Regards
Raghu.
Check all abap ports are pointing to 8000 based on your instance number and java to 50000 in exchange profile
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.