Skip to Content
author's profile photo Former Member
Former Member

From Change request(SDCR) its not creating the Normal correction (SDMJ)

Hi,

I need to create Normal correction (SDMJ) from Change request (SDCR).But In the change request(SDCR) If i select the Subject field Normal correction(SDMJ) system is creating the follow up document Correction (SDMI).

Please suggest where I need change the transaction.

Regards,

Pavan.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Sep 08, 2009 at 07:08 PM

    Use transaction SPRO to call the IMG activity SOCM_COPY_001 (Release 4.0). To do this, navigate to the "Extended Configuration" section of Solution Manager. Choose "Scenario-Specific Settings -> Change Management -> Change Request Management' -> Extended Configuration -> Change Transaction -> Change Transaction Types -> Copy Control for Change Request Management". Call the "Define Mapping Rules for Copy Control" IMG activity.

    If there is no entry for the source transaction type SDCR and the target transaction type SDMJ, copy or change the entry for the source transaction type SDCR and the target transaction type SDMI."

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.