cancel
Showing results for 
Search instead for 
Did you mean: 

planning time fence not altetated with New MRP run date

mohan_madaiah
Active Participant
0 Kudos

Hi Expert,

I have issue with planning time fence, done setting with planning time fence 15 days, MRP TYPE :P1 lot size : WB, Run MRP 1 st time let say 01.09.2018 system calculate planning time fence correctly i.e. end of planning time 16.09.2018, But in next MRP run is on 05.09.2018 still planning time showing 16.09.2018 but as per calculation it should be 20.09.2018. please guide me how achieve planning time change based on MRP run date.
thanks in advance,

Mohan

Accepted Solutions (0)

Answers (1)

Answers (1)

jessica_li
Advisor
Advisor

Hi Mohan,

Planning time fence end date should be the planning date(current date of MRP) + planning time fence time(set in MM02). May I confirm 2 points first?

1. Is MD03 used to run the MRP? I would like to make sure the MRP is really executed for the material.
2. If MRP is executed indeed, is there any chance the factory calendar has been changed between 2 MRP runs? Because planning time fence time is considered as Working days.

best regards,
Jessica

former_member605682
Participant
0 Kudos

Thank you Jessica

I to have same question in Planning time fence you answered very well