DEPARTWISE TRACKING OF MATERIAL

Former Member
0 Kudos

HI,

ALL EXPERTS,

IN ORDER TO PRODUCE 'X' PRODUCT I HAVE 5 OPERATIONS.

SUPPOSE

0010 - CUTTING

0020 - HAND GRINDING

0030 - SLOTTING

0040 - DRILLING

0050 - MILLING

0060 -CENERING & FACING

FIRST 3 OPERATIONS COMES UNDER THE PRESS SHOP DEPARTMENT, NEXT 3 OPERATIONS COMES UNDER THE MACHINE

SHOP DEPARTMENT .AFTER COMPLETING ALTERNATE OPERATIONS FROM PRESS SHOP, THE MATERIAL IS MOVED FROM

PRESS SHOP TO MACHINE SHOP. NOW OUR MANAGEMENT WANTS TO KNOW THE HOW MUCH QUANTITY OF MATERIAL

TRANSFER FROM PRESS SHOP TO MACHINE SHOP ON DAILY BASIS.AFTER RECEIVING THE MATERIAL TO MACHINE SHOP

PRESS SHOP DEPARTMENT WANTS ACKNOWLEDGMENT SLIP . (PRINT OUT).MEANS WE WANT TO TRACK THE PRODUCTION

DEPARTMENT WISE ON DAILY BASIS.HOW CAN I MAPPED THIS IN SYSTEM ? IS THERE ANY STANDARD REPORT AVILABLE IN

SYSTEM ?

PLEASE GUIDE ME STEPWISE.

REGARDS,

RAHUL

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

i agree with the magalraj suggestion but we dont want to create separate material code for this.Mangalraj ,shall i get the report

with reference to production order? This will also a beneficial for me.

THANKS IN ADVANCE

RAHUL

former_member182489
Active Contributor
0 Kudos

u need to move the remaining components to a storage location or to a defined cost centre to know the status.Normally not done with std sap process.or else do create seperate Prd order for each operations which create semi finised products and at the end will create a FG . do RG1 update at the final action and remainin is the same. but it is too hectic , not recommended

Edited by: manu m on Aug 18, 2009 7:20 AM

former_member184655
Active Contributor
0 Kudos

Dear Murugan/Vikas,

I agree with the procedure that you have explained,but in that case what will be the material code which has to be moved from

one storage location to another?

Only if the material that is coming out of the 3rd operation is having a separate code,this is possible.Again this will be processed

and after finishing the 4th and 5th operation,the final product is produced.

Correct me if I'm wrong.

Check and revert back.

Regards

Mangalraj.S

murugan_mgl
Active Contributor
0 Kudos

HI,

Unless u declare the product as finsihed, it will be with same code with which it was started.

Former Member
0 Kudos

HI,

Try this , create seprate storage locations of Press Shop Dept & Machine Shop Dept, copy movement type 311 and make 911 or z11 and take print out MB1b material document, you can trac the material movement thru MB51 report with 911 or z11 movement type.

Regards,

Vikas

murugan_mgl
Active Contributor
0 Kudos

HI,

Create two storage locations

Press shop

Machine shop

Then thro MB1B/Mvmt type-311 transfer from one s.loc to another.

U can take the print out in MB1B & get the acknowledgement

Ucan track the qty thro MMBE or MB5B