cancel
Showing results for 
Search instead for 
Did you mean: 

Sales order with multiple Schedule lines

Former Member
0 Kudos

Hello,

Could you please help me to create a sales order with multiple line items.

for example, I need to create a sales order with line item 10 with schedule lines more than 3.

Thanks in advance,

Bhaskar.K

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

asd

Lakshmipathi
Active Contributor
0 Kudos

Please try to follow as per this thread

[Read This Before Closing your Threads |;

As indicated therein, it is not necessary to add such unwanted comments after TWO YEARS; instead you could have indicated as to how the issue is resolved.

thanks

G. Lakshmipathi

Lakshmipathi
Active Contributor
0 Kudos

Go to VA01, key in sale order type, sales area and execute. There after keying in material code and quantity, hit Enter button so that all default values will flow automatically. Now double click on the material code so that some tabs you could see on top. There again click on "Schedule Lines" where for different dates, you can maintain schedules for the same material.

thanks

G. Lakshmipathi

Former Member
0 Kudos

Hi Vijay Bhaskar,

System automatically determin schudulines in sales order based on Item category of item in sales order and mrp. As per your items in the sales order the system determine schudlines.

Thanks & regards

kesav

Former Member
0 Kudos

Hi Kesav,

could you please explain me bit more how system automatically splits the schedule lines.

Bhaskar.K

Former Member
0 Kudos

As already explained Sh. Line Catg. is determined with Item Catg.of the item + MRP type automatically . As per your assignment in ( SD-sale-sales document-Sh. line-Assign Sh. line Catg.) system automatically propose the Sh. line Catg of your entered item

Now for three Sh line - in VA01 create the order with your item , give quantity -now select the line item, click on the Display item Details ICON extreme left bottom of the screen, than click on Sh. line tab here you maintain as many sh. line as you required.

Actually these Sh lines are nothing but the Requested Delivery Date And Quantity which is ultimately pass on to (Transfer the Requirement) MRP

Hope this'll help you

Ashok

Edited by: Ashok ku. on Aug 17, 2009 11:16 PM