during my pm order settlement i get this m,eassage in ko88 whats is the reason

in allocation structure i assign primary cost emnt of spares to the row of maint spares and by cots elemt to reciver category cost centre

but i get the mesassge plaese explain

During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).

Cost element 310152 cannot be assigned to a settlement cost assignment in allocation structure PM, and therefore it cannot be assigned to a settlement cost element.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Aug 14, 2009 at 02:55 PM

    Hi,

    Check the definition of the Allocation Structure "PM".

    Select the Allocation Structure (in OKO6) then go to Assignments. Select the appropriate Assignment line "the row of maint spares" and click "Source". The Cost Element 310152 has to be a part of the Cost Element range or Group. I think this is where the said Cost Element is not included in the range.

    Then select the Settlement cost element and for Reciever cat CTR check the By Cost Element box. Also check that the settlement rule is pointing to a Cost Center.

    Thanks,

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      When u run settlement, system checks what type of settlement applicable for the order type u have selected. Generally we setup 100% settlement.

      By this it becomes imperative to setup all the sending/source cost elements in the allocation structure to allocate by itself or thru settlement cost element..

      In your case, the specified Cost Element u assign in one of CostElement Group and try.

      Regards

      Sudhakar Reddy

  • author's profile photo Former Member
    Former Member
    Posted on Sep 06, 2009 at 06:40 AM

    thanks

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.