Trying to set MAC for Maintenance work order (WO) I faced with the next problem. The mandatory condition for MAC working is a record in V_T399X_S (SPRO-PM&CS and so on) table view for the plant and WO type combined. There is no such the record for my WO type and plant. Also I wasn't able to find how and when this table is populated. All the table T399X views are only to modify lines, no opportunity to insert it. I've searched the forum a lot, also was trying to find the answer in Notes. Maybe someone knows how this problem can be solved? Thanks

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

4 Answers

Maria Terence Nov 17, 2016 at 11:06 AM
0

Hi Timur,

1. Check your order type in OIOA

2. Assign your order type to Maintenance plan in OIOD

Then go to V_T399X_S in SM30 and maintain what is required.

For Material Availability check, you need to do configuration setup on below places.

1. V_441R

2. V_441V

3. V_TCO11

Regards

Terence

Show 2 Share
10 |10000 characters needed characters left characters exceeded

Thank you Maria for your quick response.

Here is a screenshot from OIOA and OIOD (is it limited in OIOD for Planing plant only?)

System configuration: we have PL01 (Planning palnt) and a lot of maintenance plants (PL10, PL20, PL30 etc).

Now we create maintenance work order for PL10 (WO01). When we run MAC for WO01 on header lvl it works so.

And it's truth first material is in stock the second is not.

When we save WO01, the field RESB-VMENG (confirmed quantity in Reservation) is not updated. So the report IWBK reflects wrong information. What can be a reason for it?

untitled.png (42.7 kB)
untitled.png (29.0 kB)
0

Hi Timur,

OIOA and OIOD is fine. What about other setup ? Refer below doc for setting those config.

MAC

Regards

Terence

0
Peter Atkin Nov 22, 2016 at 07:34 AM
0

Timur,

In addition to Terence's comments above, what values are you using in the Availability Check field on the MRP3 screens of the two materials?

PeteA

Share
10 |10000 characters needed characters left characters exceeded
Timur TM Nov 22, 2016 at 09:59 AM
0

Hi Peter,

it's 01 - daily requirements for both Materials

also for 01 01 combination in tr.OPJJ such a picture

it seems to me I've checked all the settings, and couldn't get what is missing...


capture.png (30.1 kB)
capture.png (30.1 kB)
Share
10 |10000 characters needed characters left characters exceeded
Peter Atkin Nov 22, 2016 at 12:44 PM
0

Timur,

The standard setting would be "02" for Individual Requirements

PeteA