hi all ,

I met a problem when doing production confirmation ,

a table on the scrren is like this :

order operation operation quantity confirmed yield confirmed scrap Yield Scrap

when i selected a record , pressed the button , i have to check if the control key for each operation is 'PP03' , if so , i have to put all the production to the production storage location (this is the problem , how to do this ?), and durning this part , a material document nr should be created (base on mseg ) I suppose .

should I using BAPI_GOODSMVT_CREATE to do this , if this is correct , could you give an example of how to use this BAPI base on my issue,

if not , please your advice detailly about my problem .

thanks in advance !

best regards