Skip to Content
author's profile photo Former Member
Former Member

Quotation valid to date for 30 daysu200F

Dear All,

I am looking for an option in that whenever i make a quotation with VA21, the system automatically adds 30days to current date and fill it in the validiy to date. But the user does not have the option to chnage the date with VA22.

OR

How can i configure more select options in field for Prop Valid date from in the configuration of quotaion document type

Regards

SAPXPT

Edited by: SAPXPT on Aug 12, 2009 11:30 AM

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Posted on Aug 12, 2009 at 12:12 PM

    Hi SAPXPT,

    You try this one. You assign a contract profile to your quotation type (VOV8), this will help you to defualt the end date. This is in the contracts tab in the sales document definiton tab. Kindly please let me know If you need any more hlp on this.

    Regards

    Ram Pedarla

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 12, 2009 at 02:27 PM

    Dear Ram,

    Thanks for the solution. I need more help on this. I have a contract profile and assigned to my Doc type. But i need more explanation on below fields. Please suggest values for these fields.

    Contract start rule

    Contract end rule

    Val.period.category

    Cancellation proc

    Action

    Action date rule

    Regards

    SAPXPT

    Edited by: SAPXPT on Aug 12, 2009 7:28 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 13, 2009 at 08:43 AM

    Dear Ram,

    I have made a contract profile of 1 month validity and assigned the below values

    Contract start rule = 01 Today's date

    Contract end rule = 08 Contract start date + Contract Validity

    Val.period.category = 03 1 month

    The above settings are working fine, the system now proposes the contract end date exactly after 30 days.

    My question is .......

    1.How can i move this contract expiry date into the Quotation valid to date

    2.How can i make the field of contract expiry date non-editable

    Thanks & Regards

    SAPXPT

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      A standard Contract profile has for example

      Contract start rule 01 Today's date

      Contract end rule QU Contract start date + 1 month

      Val.period.category ZQ 1 month

      But it does not have Valid from & Valid to dates present in Quotation.

      I dont think you can populate Valid from & Valid to dates present in Quotation using Contract profile.

      There is a simple solution.

      Use Userexit_Save_document_prepare (MV45AFZZ) & write a code to populate the Valid from & Valid to dates as current date & current date+1month.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.