budget analysis and RemOrd Plan

Dear all,

i meet a problem on the budget analysis.

i assign the material to the activity and generate production oders.

i use cj31 to check the budget analysis and find the following message.

ORD 9500000993

COSS 2010 01 4101011000 KPPE L RMB 91,170.08- RMB B

COSP 2010 01 4101010600 KPPE S RMB 3,264.96 RMB B

COSP 2010 01 4101010400 KPPP S RMB 2,540.20 RMB

COSP 2010 01 4101010400 KPPE S RMB 14,398.00 RMB B

COSP 2010 01 4101010200 KPPE S RMB 70,966.92 RMB B

those end with "B" are marked red, that means they are irrelevant to the budget.

that means plan value 2,540.20 RMB of order 9500000993 is the assign value of WBS

i check the order 9500000993 and find the total planned material cost is 91,170.08.

i don't know why 2,540.20 RMB is the assign value. how it is caculated?

i check the cost element 4101010400, why the amount 14,398.00 is not included in the assigned value?

What do KPPE and KPPP mean? i also see KPPP in the report S_ALR_87013558 and the amount 2,540.20 RMB is in the RemOrd Plan colum.

the status of the order is created. and then i release it.

the assigned value is not changed.

Can you give me some hints or suggestions on how the amount is caculated?

thanks a lot.

Judy

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Aug 12, 2009 at 03:10 PM

    Hi Judy,

    KPPP is a Budget type for CO Primary Costs f. Prod. Cstg.

    Check the Planned cost of the assigned finished material in Material master. It should be 2,540.20 RMB.

    Br,

    Hari.