Skip to Content
avatar image
Former Member

Credit Management - Orders released in system due to rescheduling

Hello Gurus:

I have sales orders that are releasing from credit check and giving the order status A, eventhough the risk category has the following settings:

Static and Document value check and block for open order and open deliveries. The maximum document value is set to $1.00.

The credit master is set with credit limit of $0.00.

Can someone let me know why the order is released from credit automatically once the rescheduling job is run?

How is the rescheduling job with program SDV03V02 releasing orders from a credit block when the credit master is set with $0.00 limit and both static and Document blocks are set?

Thanks,

Tal

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Aug 11, 2009 at 05:38 PM

    Hi

    Check the following link, will provide you enough info:

    http://sdconfiguration.blogspot.com/2008/02/configuration-for-credit-management.html

    Cheers

    Chandra

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 11, 2009 at 05:57 PM

    Thank you for the link, but the credit management part of our config. is stable. I have a more specific question and that is why the rescheduling job releases orders from credit block when the customer credit master has a static and document value check and the value is zero.

    Thanks,

    Tal

    Add comment
    10|10000 characters needed characters exceeded